Al-Naeem Group
The Design Concept for the 5 stories administrative building was based on using curvy lines, and consecutive partitions for the spaces, using strong, long life materials as marble for...
The Design Concept for the 5 stories administrative building was based on using curvy lines, and consecutive partitions for the spaces, using strong, long life materials as marble for...
The biggest challenge in this project was the double height of the main entrance in addition to The side staircase between ground and mezzanine floors, which have been changed...
Modern style with as artistic touch in marble works in flooring & wood cladding in space elevations, to present magnificent in main entrances and using direct & indirect lights.
Project Location: The site in located in Aswan, Al Rokaekeen Village. Project Goal: Creating a center to collect all activities to serve the village society, such as Education, Religious,...
The final phase of the construction of Al-Bakeyt Al-Salehat complex at Al- Mokattam, Cairo has been Completed. The project plays a societal role as it consists of several element...